Zhejiang Tiansheng Valve Co., Ltd. (TSV) operates an ISO 9001:2015 quality management system backed by API Spec 6D-1832 and CE PED Module H (NB 2408). Every valve undergoes 100% factory pressure testing per the applicable code and order specification, with EN 10204 3.1 material certificates and test reports supplied as standard, and EN 10204 3.2 witnessed documentation arranged per purchase order / ITP.
TSV holds genuine, up-to-date certifications issued by accredited international notified bodies and industry registries.
Certificate Number: 6D-1832
Authorizes TSV to apply the official API Monogram to pipeline ball valves, check valves, and gate valves used across critical oil and gas transportation infrastructure.
Notified Body: NB 2408
Full quality assurance certification for pressure equipment design, manufacturing, inspection, and testing for the European Economic Area under Category III & IV.
Vendor Directory: Entry #24 (Oman Operations)
Direct factory qualification following full-scope technical audit of machining precision, hydrostatic testing repeatability, and welding procedures for severe upstream services.
Triple Management Standard
Systematic quality control across the full life-cycle, including contract review, ERP order tracking, vendor evaluation, calibrated tool inspection, and environmental compliance.
Burn Test Temperature: 760℃, 1000℃
Certifies secondary metal-to-metal seating integrity and external zero-leakage packing containment when exposed to open hydrocarbon flame envelopes for 30 minutes.
ECM, Italy · No. ECM 22 ATEX-AR QS16 · Valid 2022–2032
Certified under EN ISO 80079-36 & EN ISO 80079-37 for Ball, Gate, Globe, Check, and Butterfly Valves (NPS ½"–48", Class 150–2500) in explosive atmospheres. (IEC 61508 SIL 3 qualification also available on project request.)
No valve leaves our Yongjia facility without undergoing full computerized hydrostatic and pneumatic verification.
TSV Hydrostatic Testing Station #3 · Digital Pressure Logging & Clamping Rig
Testing is conducted using demineralized water with corrosion inhibitors (chloride content < 30 ppm for stainless and duplex valves) on calibrated test benches equipped with digital pressure recording transducers.
| Valve Nominal Size (NPS) | Shell Test Pressure | Shell Minimum Duration | Hydro Seat Duration | Air Seat Duration | Allowable Leakage (Soft Seat) |
|---|---|---|---|---|---|
| NPS 2" to 4" (DN 50 to 100) | 1.5 × Rated WP | 60 Seconds | 60 Seconds | 60 Seconds | Zero Drops (Rate A) |
| NPS 6" to 10" (DN 150 to 250) | 1.5 × Rated WP | 120 Seconds | 120 Seconds | 120 Seconds | Zero Drops (Rate A) |
| NPS 12" to 18" (DN 300 to 450) | 1.5 × Rated WP | 180 Seconds | 120 Seconds | 120 Seconds | Zero Drops (Rate A) |
| NPS 20" to 36"+ (DN 500 to 900+) | 1.5 × Rated WP | 300 Seconds | 120 Seconds | 120 Seconds | Zero Drops (Rate A) |
Complete metallurgical and mechanical verification adhering to EN 10204 Type 3.1 and 3.2 protocols.
Desktop Optical Emission Spectrometer (OES) and portable XRF analyzers verify raw casting/forging chemistry. 100% verification for PREN (Pitting Resistance Equivalent Number > 40 for Super Duplex).
Universal tensile test rigs and Charpy V-Notch impact machines with liquid nitrogen baths capable of testing impact toughness down to -196℃ (77 K) for LNG and cryogenic applications.
Certified ASNT Level II inspectors perform Ultrasonic Testing (ASME B16.34 Appendix IV), Magnetic Particle Testing (ASME VIII Div. 1 App. 6), and Liquid Penetrant Testing on critical weld overlays and pressure boundaries.
We maintain routine cooperation with accredited independent inspection agencies including DNV, TÜV Rheinland, SGS, Bureau Veritas, and Lloyd's Register. Client representatives and third-party inspectors are provided with full FAT staging facilities, calibrated instrumentation, and real-time electronic pressure data logging.