API 6D Monogram Licensed: No. 6D-1832
CE PED 2014/68/EU Module H: NB 2195
Oxy Oman Approved AML: OMN-QAC-862-002
EN 10204 Type 3.1 Certified EN 10204 Type 3.2 Third-Party Full Heat Traceability PMI Optical Emission Spectrometry DNV / TÜV / Lloyd's / BV Inspection

EN 10204 3.1 & 3.2 Material Traceability Protocols

Guaranteed chemical, mechanical, cryogenic impact, and non-destructive traceability from raw foundry ingot melt batch to final finished valve assembly and pressure-retaining bolting.

Standard Project Delivery BS EN 10204

EN 10204 Type 3.1 Inspection Certificate

A legally binding document validated by the manufacturer’s authorized inspection representative, completely independent of the manufacturing shopfloor. It confirms that delivered products meet all purchase order technical requirements based on specific inspection trials on the actual heat lot.

  • Melt Heat Chemical Analysis: C, Si, Mn, P, S, Cr, Ni, Mo, Cu, V, N concentrations verified against ASTM/ASME specifications.
  • Mechanical Properties: Tensile strength, 0.2% offset yield strength, elongation, and reduction of area per ASTM A370.
  • Hardness Testing: Brinell (HBW) and Rockwell (HRC) values ensuring compliance with NACE MR0175 (≤ 22 HRC).
  • Charpy V-Notch Impact: Full sub-zero impact joules report at -29°C, -46°C, or -196°C.
✓ Provided as standard with 100% of TSV valve shipments at no additional charge.
Independent Verification Dual Sign-Off

EN 10204 Type 3.2 Third-Party Certificate

The highest level of metallurgical assurance in European and international piping standards. Validated jointly by the manufacturer’s authorized inspection representative AND an independent third-party inspection agency (TPI) appointed by the purchaser or an official regulatory authority.

  • Third-Party Witness: Accredited surveyors from DNV GL, Lloyd's Register, TÜV Rheinland, Bureau Veritas (BV), or SGS witness testing in person.
  • Specimen Stamping: TPI inspects test coupons attached to raw castings/forgings and applies physical hard stamps before destructive testing.
  • Hydrostatic Witness: TPI witnesses shell and seat pressure testing, stamping the valve body upon successful conclusion.
  • Dual Endorsement: Both TSV QA Chief and TPI Surveyor sign and stamp the final MTR dossier.
✓ Ideal for offshore platforms, subsea manifolds, nuclear power, and critical gas transport.
In-House Testing Laboratory

Mechanical, Chemical & Metallurgical Examination

TSV’s internal physical and chemical testing laboratory is equipped with calibrated XRF alloy analyzers, optical emission spectrometers (OES), and ultrasonic flaw detectors verified annually by certified metrology institutes.

Optical Emission Spectrometry (OES)

Direct-reading spectrometry and portable XRF analyzers ensure 100% Positive Material Identification (PMI) on raw castings, forgings, welding consumables, and machined stems.

ASTM E415 / E1086
Cryogenic Charpy Impact (-196°C)

Equipped with liquid nitrogen immersion cooling chambers capable of testing impact toughness down to -196°C for LNG and cryogenic valve service.

ASTM E23 / ISO 148-1
Non-Destructive Examination (NDE)

Full in-house ASNT Level II & Level III personnel for Radiographic Testing (RT), Ultrasonic Testing (UT), Magnetic Particle (MT), and Liquid Penetrant (PT).

ASME B16.34 App I-IV
Intergranular Corrosion (IGC)

Huey, Strauss, and Streicher test protocols verifying that austenitic stainless and duplex stainless alloys are completely free from carbide precipitation.

ASTM A262 Practice E

Unbroken Physical Traceability from Foundry to Jobsite

01. Foundry Melt

Casting heat number cast directly into valve body; forgings stamped at raw billet stage.

02. Receiving PMI

100% spectrometry verification against mill certificate before issuing to CNC machining line.

03. In-Process Stamping

Low-stress round-nosed steel stamps transfer heat numbers onto machined flanges and bonnets.

04. Final Dossier

Valve serial number linked to digital MTR, pressure chart, and NDE records in permanent archive.

Engineering Verification & Documentation

Request Official Certifications, Test Records, or Audit Review

Need certified copies of API 6D licenses, OXY vendor approval records, hydrostatic test charts, or an EN 10204 3.1/3.2 MTR sample? Submit your specification or inquiry below. Our quality engineering team responds within 24 hours.